Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 6 results ...

Arditi, D, Tokdemir, O B and Suh, K (2001) Scheduling system for repetitive unit construction using line-of-balance technology. Engineering, Construction and Architectural Management, 8(02), 90–103.

Boussabaine, A H (2001) Neurofuzzy modelling of construction projects’ duration I: principles. Engineering, Construction and Architectural Management, 8(02), 104–13.

Boussabaine, A H (2001) Neurofuzzy modelling of construction projects’ duration II: application. Engineering, Construction and Architectural Management, 8(02), 114–29.

Hejducki, Z and Mrozowicz, J (2001) Stream methods of construction work organization: an introduction to the problem. Engineering, Construction and Architectural Management, 8(02), 80–9.

  • Type: Journal Article
  • Keywords: construction works; optimization algorithms; organization methods; stream methods; time couplings;
  • ISBN/ISSN: 0969-9988
  • URL: http://www.ingentaconnect.com/content/bsc/ecam/2001/00000008/00000002/art00183
  • Abstract:
    This paper presents and describes basic properties of construction work organization methods which use time couplings. In addition, fundamental methods of construction work organization, which enable the scheduling and synchronization of construction works and take into account several constraints encountered in practice, are also discussed.

Lam, K C, Hu, T, Cheung, S O, Yuen, R K K and Deng, Z M (2001) Multi-project cash flow optimization: non-inferior solution through neuro-multiobjective algorithm. Engineering, Construction and Architectural Management, 8(02), 130–44.

Ofori, G and Gang, G (2001) ISO 9000 certification of Singapore construction enterprises: its costs and benefits and its role in the development of the industry. Engineering, Construction and Architectural Management, 8(02), 145–57.